New GNL Terminal, Port of Skikda - Algeria : an ACCROPODE™ project
New GNL Terminal, Port of Skikda - Algeria
The Skikda Hydrocarbon Port is being expanded to the east for the development of a new LNG terminal. The protection of the new infrastructure is ensured by the creation of a new secondary breakwater and the extension of the main breakwater protected by ACCROPODE™ units.
CLI developed a great understanding of the Contractor’s need and applied a problems solving mindset to this specific project.
Special features of the project
The project consists of the extension of the northern breakwater over 500 m and the creation of a new 870 m long breakwater to the east, in order to accommodate the new terminal of the hydrocarbon port of Skikda. Different sizes of ACCROPODE™ units ranging from 3m3 to 20m3, were used for this project.
Conditions hydrauliques
- Longueur totale de la protection en blocs ACCROPODE™ : 1 470 m
- Profondeur max : - 18.5 m
- Hauteur max de crête des blocs : + 7.50 m
Aspect construction
Digue principale :
3 m3 : 2 195 unités
10 m3 : 32 unités
20 m3 : 2 576 unités
Digue secondaire :
3 m3 : 2 381 unités
10 m3 : 2 719 unités
16 m3 : 640 unités