New GNL Terminal, Port of Skikda - Algeria : an ACCROPODE™ project

New GNL Terminal, Port of Skikda - Algeria

The Skikda Hydrocarbon Port is being expanded to the east for the development of a new LNG terminal. The protection of the new infrastructure is ensured by the creation of a new secondary breakwater and the extension of the main breakwater protected by  ACCROPODE™ units.

36.887580009185, 6.9038182553223

The added value of CLI

CLI developed a great understanding of the Contractor’s need and applied a problems solving mindset to this specific project.

Special features of the project

The project consists of the extension of the northern breakwater over 500 m and the creation of a new 870 m long breakwater to the east, in order to accommodate the new terminal of the hydrocarbon port of Skikda. Different sizes of ACCROPODE™ units ranging from 3m3 to 20m3, were used for this project.

Conditions hydrauliques

  • Longueur totale de la protection en blocs ACCROPODE™ :  1 470 m 
  • Profondeur max : - 18.5 m
  • Hauteur max de crête des blocs : + 7.50 m 

Aspect construction

Les digues ont été construites à l’aide de grues fixées sur des barges. Au total, ce sont 10 543 blocs ACCROPODE™ de 3, 10, 16 et 20 m3 qui ont été utilisés sur ce projet.
Digue principale :

  • 3 m3 : 2 195 unités

  • 10 m3 : 32 unités

  • 20 m3 : 2 576 unités

Digue secondaire :

  • 3 m3 : 2 381 unités

  • 10 m3 : 2 719 unités

  • 16 m3 : 640 unités

Country
Algeria
Owner
SONATRACH
Company
CHINA HARBOUR ENGINEERING CO. Ltd
Designer
CHINA HARBOUR ENGINEERING CO. Ltd Design Department
Date
2019 - 2023
Role of CLI
Sublicense contract and technical assistance for ACCROPODE™ units